What is Scheduling? Definition
The definition of scheduling equally quoted past times eminent scholars are equally follows:
production command which rates the piece of work inwards the club of its priority too thus provides for its liberate to the found at the proper fourth dimension too inwards the right sequence. Thus, it is concerned alongside when piece of work shall hold out performed on a production or part.”
This definition is referred from a volume titled ‘Industrial Organization too Management,’ kickoff published inwards 1945. This volume is a collective piece of work of Franklin S. Atwater, Lawrence L. Bethel, Harvey A. Stackman (Jr) too George H. E. Smith.
4. According to Leon Alford too Henry Beatty,
“Fitting specific jobs into a full general time-table thus that orders may hold out manufactured inwards accordance alongside contracted liability, or inwards majority production, thus that each factor may larn inwards at too travel into into assembly inwards the club too at the fourth dimension required.”
Alford too Beatty expressed inwards a higher house quote inwards their piece of work titled ‘Principles of Industrial Management’ published inwards 1951.
Meaning of Scheduling
The pregnant of scheduling tin dismiss hold out grasped from the ikon depicted below:
production planning alone. However, it is the 2nd pace inwards production planning too control.
The primary purpose or objective of scheduling is to run into that all production operations are completed inwards a given time. If the production is completed inwards an allotted time, only, then, the delivery of goods tin dismiss hold out made on time. If this happens, it volition increase the goodwill of the company.
The functions or physical care for of scheduling is equally follows:
- Make a listing of all the production activities.
- Fix the starting fourth dimension for each activity.
- Fix the finishing fourth dimension for each activity.
- Prepare the time-table.
This article on scheduling is continued inwards the next post:
The kinds or types of scheduling are listed below:
- Master scheduling : The appointment of completion of production is assigned or fixed along alongside phase wise performance schedule.
- Operation scheduling : The fourth dimension required to produce around amount of piece of work (task or job) alongside a given motorcar or physical care for is fixed.
- Detail performance scheduling : First, all details necessary to produce around amount of piece of work alongside a given motorcar or physical care for are identified. Later, fourth dimension required to consummate each exceptional performance of piece of work is fixed.